Monday 6 April 2015

Wye


seventeen wye river ‘found haiku’ philip harvey collected in april 2015 from the ‘wye river separation creek progress association community newsletter easter 2015’ 

lack of progress in determining alignment for the river walk

funding problematic due to stalemate between principal parties

the reconstruction of the separation creek bridge in mid-winter

very sedately call-out wise with only half a dozen turnouts

they gained experience in burn patterns and fire behaviour

if grass is long around the station it means kev is caravanning

recommendation on extreme and code red days: leave and leave early

thanks to those who donated clothes books surfboards wetsuits and so much more

corangamite region estuary watch programme has expanded

a photo from ocean-side pedestrian bridge really says it all

patrolling finishes unusually early, on easter monday

beach conditions have been pretty consistent with fewer rips and swells

committee decided it is time to give easter wind ding a rest

realignment of path around the slip was completed, well received

rejuvenated wall is expected to have increased working life

listening to the music while watching the sea and the sun setting

lovely: not too many people, the sun shining and it’s not too hot

No comments:

Post a Comment